Fabric is stretched, pulled and compressed on its way from the knitting or weaving machine, through dyeing and finishing, onto the roll. It holds that tension like a spring. If it is spread and cut while still tense, the panels spring back later, in the sewing room or in the wash, and the garment comes out smaller or twisted than the pattern intended.
What relaxation means
Relaxation is simply letting the fabric rest, with as little tension as possible, so the stored stretch can release before cutting. It matters most for knits, especially cotton jersey, rib, fleece and anything with elastane, but it also affects stretch woven fabrics and some dense wovens.
Two ways to relax fabric
- Roll relaxation. The roll is opened and the fabric is laid loose, or allowed to rest on a flat surface, in a controlled space. This is slower and needs floor area.
- Spreading and resting. The fabric is spread on the table without pulling it, then left to rest as a lay before cutting. Many cutting rooms do this for knits, and it fits normal table flow if the planning allows for the waiting time.
How long to rest depends on the fabric, the finishing process and the buyer. Some buyers or mills specify a minimum rest period. Where nothing is specified, the cutting room should agree a rest time per fabric type from test results and then follow it, instead of leaving it to whoever is spreading that day.
Testing before bulk
Do not guess. Before bulk cutting, run a dimensional stability test on the fabric lot, following the method your buyer requires, and compare the result with the allowed shrinkage in the specification.
- Mark a measured square on a fabric sample, away from the selvedge.
- Wash and dry the sample using the buyer's test conditions.
- Measure again in length and width.
- Calculate the change as a percentage of the original measurement.
The result tells you whether pattern allowances are right. If the test shows more shrinkage than the pattern allows, tell the pattern maker and merchandiser before cutting, not after sewing.
Fabric type changes the plan. Open-width finished knits are usually more stable than tubular knits that have been slit, and fabrics with elastane recover slowly, so they often need a longer rest than plain cotton. Fabrics that were heat-set at the mill behave differently from those that were not. If the mill supplies its own shrinkage figures, treat them as a starting point and still run your own test on the received lot, because transport, storage and finishing variation all count.
Mistakes that cause size problems
- Pulling the fabric by hand to straighten the lay, which stretches it again.
- Spreading at high speed with strong tension on the roll feed.
- Cutting one lot after relaxing and the next lot straight off the roll, in the same order.
- Checking shrinkage only on the first lot and assuming all later lots behave the same.
- Hanging knit fabric on a rack, so its own weight stretches it.
What to record
Note the roll number, the lot, the rest time used and the shrinkage test result against the lot. When a size complaint comes back from the sewing line or the buyer, this record tells you quickly whether the fabric or the process caused it.
The practical takeaway
Relaxation costs time and table space, and both must be in the plan. It is far cheaper than recutting or remaking a size set. Include it in the cutting schedule as a visible step, with a start time and a release time, so the cutting room is never pushed to cut fabric that has not rested. This is one of the checks in the cut-to-pack readiness checklist.