Skip to content

Insightsijaz anwar career

Ijaz Anwar's Career Journey Across Five Manufacturers

Follow Ijaz Anwar's path from QMS Supervisor in 2003 to General Manager, Cut to Pack, across Needle Point, Sapphire, Zephyr, Masood and W. Brothers.

By Muhammad Ijaz Anwar · Updated 17 November 2026 · 2 min read

Ijaz Anwar's career is a steady climb through five textile and apparel manufacturers over more than two decades. Reading it in order shows how a quality supervisor became a General Manager responsible for cut-to-pack. Dates and titles below come directly from his CV.

2003 to 2005: Needle Point, QMS Supervisor

Muhammad Ijaz Anwar started at Needle Point (Pvt.) Ltd. in February 2003 as a QMS Supervisor. The work was hands-on: supervising inline and final inspections for export production, and evaluating raw materials, trims, packaging and embellishments. He handled technical correspondence with buying-office auditors and vendors, supported new-style and accessory approvals, and checked dye batches against CMC spectrophotometer readings and visual standards.

Why it matters: this is where the habit of checking against a standard, and writing it down, begins.

2005 to 2018: Sapphire Fibers, Deputy Manager

His longest period was at Sapphire Fibers (Pvt) Limited, from May 2005 to December 2018, as Deputy Manager. He managed customer quality requirements across 13+ global apparel accounts, ran internal and self-audits, and prepared compliance and performance reports for international buyers. He authorised dye-batch sign-offs for shade matching, GSM and physical fabric characteristics, and coordinated product development and sampling, including proto, size sets and production cut-to-pack seal samples.

Customers named for this period include Russell Europe, Kariban, Stanley & Stella, Sol's, Falk & Ross, Mondetta and others.

2018 to 2020: Zephyr Textile, Production Cut-to-Pack Manager

In December 2018 he moved to Zephyr Textile (Pvt) Limited as Production Cut-to-Pack Manager, staying until July 2020. This is where cut-to-pack became the centre of the job. He coordinated execution from fabric readiness and production handover through packing and ex-mill dispatch, ran daily production reviews, supported monthly performance reviews with senior leadership, and monitored dye-batch release so approved fabric was ready before bulk production.

2020 to 2022: Masood Textile Mills, Senior Manager, QMS

From November 2020 to November 2022 he was Senior Manager, QMS at Masood Textile Mills (Pvt) Limited. The focus was preventing quality issues from disrupting flow and shipments. He supported floor implementation of JIDOKA, KANBAN visibility, operator self-inspection, GEMBA walks and Total Line Stabilization, joined pre-production and risk-assessment meetings, and coordinated with external auditors.

2022 to present: W. Brothers Apparel, General Manager, Cut to Pack

Since November 2022 he has led day-to-day production and cut-to-pack operations at W. Brothers Apparel, turning order priorities and delivery dates into floor plans from material readiness through shipment. Current customers listed are JD, Ellesse, Blank Essentials and Jack.

The pattern

Three threads run through every role:

  • Standards first. Quality, shade, GSM and approvals were part of his work from the first job.
  • Systems on the floor. Audits, daily reviews and Lean routines appear at each stage.
  • Delivery. The responsibility widened from inspecting product to owning the whole order-to-shipment flow.

For the broader summary, see the about page. If you are a factory owner wondering how this experience applies to your plant, see consultancy.